Specifications
Specifications
Detailed mission statement that has something for every member of the team, for each group in the team and for the team over all.
Pay
List of required documents for SDLC under ISO 12207. (F-85741)
Members
Checklist for the business plan, including some suggested topics/headings.
Members
A planning outline (a ten-step process) for the preparation of the Requirements Document.
Members
Checklist for making sure you have covered everything when preparing the Requirements Document.
Members
Design document for Fast Track and Regular Track software development projects.
Members
Analysis & Detailed Design documents for a small shop. Per ISO/IEC 12207
Members
Explanations for topics identified in the Project Plan Checklist.
Members
A list of 24 possible standards to be prepared for the project under ISO/IEC 12207.
Members
A simple 8 step process from Business Case to Installation and Archiving for a fast track development.
Members
Development Regular Track intended for product enhancements that will take over 40 manhours.
Members
Policy. Issues related to company products (defects and enhancements) handled by a consistent system of prioritization and selection for development.
Members
Declaration in the Australian Capital Territory to users of the website.
Members
Procedure showing the instructions for change management on an IT-related project.
Members
White paper on the rules for change management.
Members
A document review control sheet for a technical document to be formally reviewed by a review panel.
Members
A set of detailed document review sheets for a technical document being formally reviewed by a review panel.
Members
List of cognitive milestones describing the key moments in the project for the client for sign=off and payment.
Request
Network for a small business, depicting two tier (three hubs), five departments, multiple compatibility.
Members
Small network for a small business, depicting two tier (three hubs), five departments, multiple compatibility (because the design/engineering dept uses MACs but the Accounts/Sales uses IBMs),
Members
Legally binding declaration to users of the website in the State of New South Wales.
Members
Legally binding made available to users of the website in the Northern Territory.
Members
Single-tier topology based on 1 hub (also known as a simple star configuration), IBM compatible at the node.
Members
Declaration in the State of Queensland available to users of the website.
Members
Response to a Request for Quotation (RFQ) for the supply of goods and services.
Members
A legally binding declaration to users of the website in the State of South Australia.
Members
Storage Area Network (SAN) - SCSI star configuration.
Members
Storage Area Network (SAN) - TCP/IP star configuration.
Members
Storage Area Network (SAN) - TCP/IP star configuration.
Members
A diagram depicting a simple star configuration made up of 4 IBM desktop computers around a hub.
Free
Following a successful feasibility study at stage 2, we now move into a detailed User Specification.
Members
Preparation of a detailed System Specification, that will be approved by the board as the basis for all system development to follow.
Members
Overall system design based on stage 4.
Members
Program specification in stage 4.
Members
Relational database design based in stage 4.
Members
Specification of the data dictionary in stage 4.
Members
A data flow (input and output) specification in stage 4.
Members
Operational routines (such as audit reporting and error routines) and user variations, in stage 4.
Members
Implementation plan based on stage 4 of BS5515 (1984).
Members
A change control record and a system amendments record set up in stage 4 and recording all changes to plan from now on.
Members
A comparative evaluation based on ISO-8402.
Members
Legally binding declaration to users of the website in the State of Tasmania.
Members
A high level technical assessment form for evaluation of vendor software.
Members
Tender document for small amounts with most of the tender key details obtained on schedules provided by the Issuer and filled in by the Tenderer. (T-20811)
Members
Two-tier hierarchical topology - 3 hubs.
Members
Diagram depicting a network made up of three UNIX servers in three countries, using standard telephone links between them to establish a standard relay UUCP network.
Members
Network made up of three UNIX servers in three countries, using standard telephone links between them to establish a standard relay UUCP network.
Members
Legally binding declaration indicating to the user their agreement to current terms and conditions that is implied by his/her use of the website.
Members