System specification (or Project plan)

System specification (or Project plan)

Procedure showing the instructions for change management on an IT-related project. J-58242

Members

AUD $1.10

White paper on the rules for change management. F-49060

Members

AUD $1.10

A document review control sheet for a technical document to be formally reviewed by a review panel.

Members

AUD $3.30

A set of detailed document review sheets for a technical document being formally reviewed by a review panel. C-80748

Members

AUD $1.10

Request

AUD $0.00

Preparation of a detailed System Specification, that will be approved by the board as the basis for all system development to follow. (F-52359)

Members

AUD $4.40

Overall system design based on stage 4. F-76076

Members

AUD $1.10

Sub-system design based in stage 4. F-11869

Members

AUD $1.10

Program specification in stage 4. F-53713

Members

AUD $1.10

Relational database design based in stage 4. F-52148

Members

AUD $1.10

Specification of the data dictionary in stage 4. F-82423

Members

AUD $1.10

A data flow (input and output) specification in stage 4. F-22304

Members

AUD $1.10

Operational routines (such as audit reporting and error routines) and user variations, in stage 4. F-86244

Members

AUD $1.10

Implementation plan based on stage 4 of BS5515 (1984). F-25096

Members

AUD $1.10

A change control record and a system amendments record set up in stage 4 and recording all changes to plan from now on. F-93256

Members

AUD $1.10