System specification (or Project plan)
System specification (or Project plan)
Sub-system design based in stage 4. F-11869
Members
A data flow (input and output) specification in stage 4. F-22304
Members
Implementation plan based on stage 4 of BS5515 (1984).
Members
A document review control sheet for a technical document to be formally reviewed by a review panel.
Members
White paper on the rules for change management.
Members
Relational database design based in stage 4.
Members
Preparation of a detailed System Specification, that will be approved by the board as the basis for all system development to follow. (F-52359)
Members
Program specification in stage 4. F-53713
Members
Procedure showing the instructions for change management on an IT-related project.
Members
Overall system design based on stage 4. F-76076
Members
A set of detailed document review sheets for a technical document being formally reviewed by a review panel. C-80748
Members
Specification of the data dictionary in stage 4.
Members
Operational routines (such as audit reporting and error routines) and user variations, in stage 4.
Members
A change control record and a system amendments record set up in stage 4 and recording all changes to plan from now on.
Members