System specification (or Project plan)

System specification (or Project plan)

Sub-system design based in stage 4. F-11869

Members

AUD $1.10

A data flow (input and output) specification in stage 4. F-22304

Members

AUD $1.10

Implementation plan based on stage 4 of BS5515 (1984).

Members

AUD $55.00

A document review control sheet for a technical document to be formally reviewed by a review panel.

Members

AUD $3.30

White paper on the rules for change management.

Members

AUD $33.00

Relational database design based in stage 4.

Members

AUD $11.00

Preparation of a detailed System Specification, that will be approved by the board as the basis for all system development to follow. (F-52359)

Members

AUD $22.00

Program specification in stage 4. F-53713

Members

AUD $1.10

Procedure showing the instructions for change management on an IT-related project.

Members

AUD $22.00

Request

AUD $0.00

Overall system design based on stage 4. F-76076

Members

AUD $1.10

A set of detailed document review sheets for a technical document being formally reviewed by a review panel. C-80748

Members

AUD $1.10

Specification of the data dictionary in stage 4.

Members

AUD $11.00

Operational routines (such as audit reporting and error routines) and user variations, in stage 4.

Members

AUD $11.00

A change control record and a system amendments record set up in stage 4 and recording all changes to plan from now on.

Members

AUD $11.00