Professional & Other

Professional & Other

Meeting - CS-style - floor plan layout

CS = Class (singles); also known as CE = Class (exam) style. They are each seated separately because at some point in the meeting they are going to be asked to complete an important document, such as a scientific enquiry or political feedback which requires it to be completed without the involvement of others. The numbers are 2 lecturers and 30 class-mates, which is considered to be about right for this style. (meeting 9)

Document image: 
AUD $0.00

Vic. - Outsourced Manufacturing Agreement

An agreement between a company and a contractor in the State of Victoria for an outsourced manufacturing process where the product is supplied by the company, worked on by the contractor and then delivered back to the company. It contains commitments to schedules, times and pricing, and talks about performance targets, responsibility for loss in delivery, indemnities for quality and warranties of final product.

Document image: 
AUD $55.00

Contract - website design - upfront fee & hourly rate

This Service Contract is for a contractor to work on a website design project to be completed by a given time (the 'term') and to be paid for a given number of hours within that term. An initial payment is required to get the job under way and a 'backout clause' allows the Client to cancel within 30 days, but, after this date, both sides are committed to completing the job as agreed. For small jobs 100% is required up front. There are specific clauses related to website design, trademark and copyright and suggested appendices detailing the website design process.

Document image: 
AUD $33.00

*Recovering from a poor ERP implementation

Many organisations are suffering the legacy of poorly performing ERP systems as a result of implementation projects failing, shortcuts taken during implementation, poor data migration, systems and processes not matching, poor software evaluation & selection, misinformation or lack of knowledge on what the ERP system is supposed to do. The company has paid the money and have sunk the costs into the technology and irrespective of what other actions are taken to recover monies, the fact remains value has to be obtained from the system.

Document image: 
AUD $0.00

Pages

Subscribe to RSS - Professional & Other